Overview
Sat. June. 6.
Worked at pipe-drains in SE corner of CK p[addock] + put in a branch drain on the north side of the main pipe-line. A good flow of water which increased very considerably as we deepened the drain.
Worked at pipe-drains in SE corner of CK p[addock] + put in a branch drain on the north side of the main pipe-line. A good flow of water which increased very considerably as we deepened the drain.