item details
Overview
This extract originally appeared in New Zealand Photography Collected: 175 Years of Photography in Aotearoa (Te Papa Press, 2025) on page 141.
One of the great engineering feats of the gold-mining industry in New Zealand was the government-funded construction of an extension to the 66-kilometre water race that supplied mining operations near Kumara in 1912. It involved running massive pipes with flexible joints across the Taramakau River. In this atmospheric close-up photograph we are standing on a pontoon where sections of pipes were bolted together as the pontoon gradually moved across the river. The pipe is just visible entering the river at a steep angle on the riverbank in the background. The syphon pipeline was opened with fanfare by the minister of mines, and Greymouth photographer James Ring made a special album documenting the project. He may have intended it as a presentation album for the minister, the contractors or other parties involved. Unfortunately, the system had its faults, and it was replaced by a pipe bridge across the river within three years. When a major break occurred in the flexible pipeline in 1925, it was not repaired.